Ditches and Bridges

Updated: Feb 14, 2019

First job today was to build a bridge in the new splay over the ditch that would take 20 ton lorries of stone. Once the ducting and pea gravel was in, the first load of 20 tons was poured on top. Quite a height difference between road edge and our driveway too so needed gradient. We will obviously tarmac and finish properly to roadside before it’s used in angst, this is just to get the huge lorries in. 100 tons gone in today, same again tomorrow. We have moved so much topsoil that things can get a little messy. James and I are both keen to keep the road as clean as possible.

#newventure #campsite #muchmarcle #driveway #digger #herefordshire #gloucestershire #builddrive #stoneroad #aggregate #splay #shovel #spade



4 views

Our Address

Contact Us

We Accept

Follow Us

Cwtch Cabins & Camping

Much Marcle

Ledbury

Herefordshire

HR8 2NN

TEL: +447981191961   

E-MAIL: hello@cwtchcabins.com

We will send an invoice via email for a deposit with details for online payment.

  • Facebook Social Icon
  • Instagram Social Icon

© 2018 by Cwtch Cabins & Camping Proudly created with Wix.com